Custom pool construction in Mesa and the East Valley

Designed in 3D, priced in writing, and built by the licensed contractor who shows up on site. Here is what goes into the price and how the build actually runs.

A new pool in the East Valley runs from design through permits, excavation, steel, plumbing, gunite, tile, decking and interior finish, to startup. Arizona Waterscapes designs it in 3D first, prices it in writing, and builds it with the owner on the job.

Two things are worth settling before anyone digs: who you will deal with between trades, and what the written price includes and leaves out. Arizona Waterscapes builds pools of all sizes, from modest backyard pools to large custom designs, and the owner, Dallin Ellingson, designs every project and stays on the build.

Start with how you will use the yard

The best design conversations are not about pool shapes. They are about who swims, how often, and what the backyard is supposed to do on an ordinary evening.

The yard sets limits too: setbacks, easements, access for equipment, existing trees, where the utilities run, and how much usable space is left once the pool and deck are placed. We work through all of it on the first visit.

What goes into the price

A custom pool is priced to the yard and the design, so a figure given before someone has seen your yard is an estimate at best. These are the drivers:

DriverWhy it moves the price
Size and depthMore perimeter and more depth mean more excavation, steel, gunite and finish — the base of every estimate
Interior finishPlaster, quartz and pebble sit at different price points and different lifespans
DeckingOften the second-largest line after the pool itself. Travertine, pavers and concrete differ in both material and labor
SpaStructure, extra plumbing, heat and controls — a meaningful addition, not a detail
FeaturesGrottos, slides, water and fire features, Baja shelves, in-pool seating
EquipmentPump, filter, sanitation, automation, lighting, heat — and how much you want to run from your phone
Site conditionsAccess for machinery, caliche or rock in the dig, grade changes, retaining, utility relocation

You get a written price with a defined scope alongside your 3D design. Financing is available for approved buyers through our partner, from about $370 a month; Arizona Waterscapes is not the lender.

What should a pool proposal spell out?

Two bids for the same yard can differ for reasons that have nothing to do with quality. The difference is often in what each one assumes. Whoever you choose, a proposal worth signing says, in writing:

What can become an extra charge?

Depending on the contract, any of these can: harder ground than the price assumed, utilities that have to be moved, equipment access that is more difficult than expected, changes an HOA or city requires after the design is set, and upgrades chosen during the build. The point is not that they will happen. It is that each should be addressed in the proposal before you sign, so a change is a decision you make rather than a surprise.

Illustrative scenario, not a past project: a homeowner receives two bids for the same pool. One lists an excavation allowance and says what happens if the dig hits cemented ground; the other says nothing about it. The second may look cheaper, but if hard ground turns up, the cost question is still open. The homeowner is comparing two different promises, and the way to compare them is to ask both builders the same question about the dig before signing either.

How an inground pool gets built

  1. Design consultation. We walk the yard, take measurements, and talk through how you want to use it.
  2. 3D design and written scope. You see the pool before it exists, and the scope says what is included and what is not.
  3. HOA review and city permit. These are two separate approvals. Where your community has an HOA, its architectural review is required in addition to the city permit, and each community sets its own order. Timelines depend on the city and the community.
  4. Layout and excavation. The pool is marked out in the yard — the moment the design becomes real — then dug.
  5. Steel, plumbing and electrical. Rebar cage, plumbing runs, bonding and conduit. Your city sets the inspection stages, and steel and plumbing are usually inspected before they are covered.
  6. Gunite. The shell is sprayed and then cures. It gets watered during this period; that is normal and necessary.
  7. Tile, coping and decking. The pool starts looking like the rendering.
  8. Interior finish and fill. The surface is applied and the pool is filled immediately.
  9. Startup and handover. Equipment commissioning, water chemistry through the critical first days, and a walkthrough so you can run your own pool.

Our published target is about 60 days from excavation to startup on a typical build. It is a target, not a guaranteed completion date, and it does not include design, HOA review or the city permit, which come first. Weather, inspections and custom feature work can extend it. What Mesa, Gilbert and Chandler each ask for in a permit is set out in pool permits in Mesa, Gilbert and Chandler.

What does a pool build look like, stage by stage?

One pool and raised spa, photographed at six points in the build.

Backyard before construction with a curved flagstone patio under a covered porch, stone-clad columns, a gravel yard and a golf course beyond a low block wall
1. The existing backyard before work starts.
Staged excavation in a backyard, with a mini excavator and skid steer beside the patio and string and paint marks showing the pool layout on bare ground
2. Layout marked on the ground, with excavation equipment on site.
Pool and spa excavation with a rebar steel cage and white plumbing lines in place inside wood forms beside the house
3. Excavated, with the steel cage and plumbing lines in place.
Sprayed concrete shell of a rectangular pool with a raised spa and plumbing fittings showing, before tile and interior finish
4. The sprayed concrete shell of the pool and raised spa.
Finished pool and raised spa with light stone coping and decking, interior finish applied and water beginning to fill
5. Interior finish applied and the pool starting to fill.
Filled pool with clear blue water, entry steps and a raised spa beside light stone decking and a white metal fence
6. The finished pool and raised spa.

Building in Arizona specifically

Soil, and what the dig may hit. It varies across the East Valley. USDA soil survey data maps no cemented hardpan inside Gilbert, where the issue is expansive clay, while parts of Mesa, mainly on the north and northeastern fringes, are mapped with an indurated pan or shallow bedrock within inches of the surface. Strongly calcareous soil with carbonate nodules, which homeowners reasonably call caliche, is mapped across much of the Valley and is normal to dig. Survey maps are far coarser than a single lot and do not replace looking at yours, so the useful step is to have excavation conditions treated as a written, priced term in the proposal. Caliche or clay explains the figures and their limits.

Barrier requirements. Arizona's pool barrier law (A.R.S. § 36-1681) sets statewide requirements for enclosing a residential pool, and cities add their own code on top. Barrier compliance is part of the design, not an afterthought, because it affects fencing, gates and sometimes the doors between the house and the yard.

Sun and water. Hard water and intense sun bear on the finish decision, the equipment choices and the amount of shade worth building. Hard water and pool plaster shows the water hardness figures published for Mesa, Chandler and Gilbert.

HOA review. Many East Valley communities require architectural approval before construction, separately from the city permit. We prepare those submittals alongside the city permit.

Which authority issues the permit. A mailing address does not always identify the permitting authority. Some addresses sit in unincorporated county land rather than inside the city named on the mail, so the building department that covers your parcel is worth confirming before design starts.

Choosing who builds it

You are handing a stranger a large sum of money and your backyard for a couple of months. Worth checking, of any builder, including us:

Common questions

How long does it take to build a pool in Arizona?

We target about 60 days from excavation to startup on a typical build. That clock starts at the dig. Design, HOA review and the city permit come first and vary by city and community, and weather, inspection scheduling and custom feature work can extend the build. It is a target, not a guarantee, and the full design-to-startup timeline is longer than the construction stage alone.

Do I need a permit, and do you handle it?

A new pool is a permitted project in Mesa, Gilbert and Chandler, with barrier compliance reviewed as part of it, and the other cities we serve have their own rules; and many communities also require HOA architectural approval as a separate step. Confirm the rules for your own parcel with its building department. We prepare and submit both the permit and the HOA package. The three biggest East Valley cities ask for different things up front, and pool permits in Mesa, Gilbert and Chandler lists them.

What is the best time of year to build?

The right start date depends on how long design, HOA review and the city permit take, because construction cannot begin until they are done. Heat and storms can affect specific stages, such as the interior finish, so ask any builder how they schedule around them and what that does to the timeline.

Can you build a pool in a small or hard-to-access yard?

Often it can be done, depending on the width and height of the access, the equipment needed and the lot itself. Narrow side-yard access changes the equipment and how material is moved, which can affect cost and schedule. We assess access on the first visit.

Illustrative scenario, not a past project: a yard reached only by a narrow side gate. The questions are whether an excavator can enter or the dig has to be done with smaller machinery, how concrete and decking material will be moved, and whether the equipment pad can be reached. The answers change method, cost and schedule, and they are best settled in the proposal, not discovered on dig day.

Should I add the spa now or later?

Building it with the pool is usually simpler than adding it later. A spa built with the pool can share the structure, plumbing and equipment. Added later it generally means its own excavation, plumbing and permit, and work around decking that already exists. Whether a spa fits your budget and how you use the yard is the real question.

Where we build

We design and build throughout Mesa, Gilbert, Chandler and Queen Creek, as well as Tempe, Apache Junction, Gold Canyon, Scottsdale, Paradise Valley and Phoenix. Locally owned and operated by Dallin Ellingson, AZ ROC #361736.